  • Insufficient flow in chilled water piping system

    Insufficient flow in chilled water piping system

    This healthcare client contacted us regarding insufficient cooling during peak needs in the summer. Discovered the original chilled water piping system was compromised by a follow on project adding cooling capacity needs in excess of original system capability. Additionally, the follow on project connected to the original piping system inappropriately causing significant decrease in water Read more

  • Wet Filters

    Wet Filters

    This client contacted us regarding wet filters in four packaged Air Handling Units (AHU). Discovered the filter bank was moved inside the AHU housing to accommodate an added steam humidifier. The relocated filters were too close to the cooling coil, consequently getting wet due to moisture carryover. Read more

  • Healthcare Facility Laboratory Infection Control

    Healthcare Facility Laboratory Infection Control

    This client contacted us regarding inadequate airflow in a healthcare facility’s laboratory. Discovered the original space load calculations were very limiting causing shortage of cooling capacity as space cooling needs increased over time. Consequently, the Variable Air Volume system couldn’t keep up to effectively control air flow from contaminated areas. Read more

  • Cold rooms during heating season

    Cold rooms during heating season

    This client contacted us regarding heating problems after a heating system renovation. Two problems were identified, a substitute equipment manufacturer did not meet the original design performance specifications and the system piping design was undersized for proper heating water flow. Read more